- OTHM Level 5 K/650/1117 – Promoting Equality, Diversity, and Inclusion in Health and Social Care, Assignment, ILC, UK
- 7CO01: Critically evaluate underpinning theory and practice in this area and make recommendations for your organisation: Work and working lives in a changing business environment, Assignment, CIPD level 7, UK
- 7CO01: Evaluate the current trend for organisations to move from a five-day to a four-day working week without reducing their employees: Work and working lives in a changing business environment, Assignment, CIPD level 7, UK
- 7CO01: Critically discuss the current state of the major labour markets in which your organisation competes for staff in terms of both demand for and supply of skills: Work and working lives in a changing business environment, Assignment, CIPD level 7, UK
- 7CO01: Critically evaluate whether advancing technologies, and particularly artificial intelligence (AI): Work and working lives in a changing business environment, Assignment, CIPD level 7, UK
- Unit DAC4A1: Lead communication in adult care settings, Assignment, UOB, UK
- Unit HSC301: Role of the inter- professional team in delivering Health and Social care: An introduction to Health and Social Care, Assignment, UK
- Unit HSC301: The importance of regulatory bodies in delivery of high quality care: An introduction to Health and Social Care, Assignment, UK
- Unit HSC301: The main roles and responsibilities of Health and Social care workers when delivering care: An introduction to Health and Social Care, Assignment, UK
- Unit 04: Use an appropriate design tool to design a relational database system for a substantial problem: Database Design & Development, Assignment, BTEC Level 5, UK
- Unit 04: Centralized Database for MadZoo Digital-MadZoo Digital is a start-up company which was established in 2020: Database Design & Development, Assignment, BTEC Level 5, UK
- 5HR02: This unit focuses on the importance of effective workforce planning: Talent management and workforce planning, Assignment, CIPD, UK
- BMG847: Demonstrate a critical understanding of different research strategies and approaches: MSc International Business, Assignment, UU, UK
- Explain how the boundary layer thickness is defined- Give the definition of the friction coefficient: Thermofluids, Assignment, UOS, UK
- A thin-walled cylindrical pressure vessel with a diameter, D = 8 m, and an operational pressure 5 MPa made from a steel: Thermofluids, Assignment, UOS, UK
- Explain the physical importance and give the mathematical definition: Thermofluids, Assignment, UOS, UK
- 7HR01: Critically evaluating how this influences the work of its people professionals: Strategic employment relations, Assignment, CIPD, UK
- CIPD Level 3 3CO03: Ethical practice review A key responsibility for all ‘professionals’ is to regularly review and develop our performance at work: Core behaviours for people professionals, Assignment, UK
- CIPD Level 3: 3C002- Explain what evidence-based practice is and how it might be applied within an organisation: Principles of Analytics, Assignment , UK
- NVQ Unit 13 – Explain what it means to have a duty of care in your role and how it relates to duty of candour: The principles of Duty of Care, Assignment UK
Figure A1 a shows a borehole log and undrained shear strength profile It is proposed to excavate to 1 m below ground level and construct a 2 m square: Foundation engineering Assignment UoL, UK
University | University of Leicester (UoL) |
Subject | Foundation engineering |
Section A
1. Attempt this entire question.
(a) Figure A1a shows a borehole log and undrained shear strength profile. It is proposed to excavate to 1m below ground level and construct a 2m square, 0.5m deep concrete foundation carrying a total load of 200kN and a variable load of 100kN. Engineered fill is placed above the foundation up to ground level. The groundwater level is 1.5m below ground level. Using global factors, determine whether the foundation is acceptable.
(b) 0.3 diameter CFA piles will be used to support the slurry tank shown in Figure A1b. The tank will be a piled raft supported by 20 piles at 1m centers. The ground level around the building will be raised by 2m using engineered fill after the building is built. Assume that the walls and floor of the tank are 0.2m thick and the density of the slurry is 1100kg/m3. Calculate the maximum load on the pile group
Do You Need Assignment of This Question
Figure A1b Cross-section showing the soil profile and location of tank supported by piles
(c) Piles are to be used as anchors for ships tied up to a quay wall (Figure A1c). Calculate the lateral resistance of a 0.5 diameter 5m long concrete pile. The piles are installed in engineered fill, which is formed of coarse-grained soil. The river level is 2m below ground level. Assume the unit weight of the engineered fill above the groundwater level is 16kN/m3 and, below the groundwater level 19kN/m3. The angle of friction of the fill is 35o.
(d) A 5m diameter 3m high steel water tank is built on a 0.5m thick platform of engineered fill. The fill sits on the top of a 1m thick layer of firm clay, which is underlain by weathered rock. The coefficient of volume compressibility of the clay is 0.3m2/MN and that of the weathered rock, 0.03m2/MN. Estimate the average settlement of the tank which, when empty, weighs 71kN [8 marks]
(e) The external dimensions of a water tank are 3m deep, 4m wide and 8m long. It is constructed of 0.2m thick concrete walls and a base slab. The top of the tank is 0.3m above ground level. The tank is placed in a 2m deep excavation in a stiff overconsolidated clay as shown in Figure A1e. The groundwater level is at 0.5m below ground level. In order to construct the tank, the groundwater level near the excavation was lowered to 2.5m below ground level; i.e. the tank was built in a dry excavation. Determine the possible load combinations acting on the tank and calculate the design loads using Design Approach 1 Combination 1.
Buy Answer of This Assessment & Raise Your Grades
Section B Attempt all questions
2. It is proposed to build a 3m high approach embankment to a bridge over a river. Figure B2 shows the dimensions of the embankment and ground profile. The embankment is built on a compacted gravel layer, which has a unit weight of 17kN/m3. The gravel layer was in place six months before the embankment was constructed and replaced the topsoil. The engineered fill used to form the embankment has a unit weight of 17.5kN/m3. Estimate The total settlement of the embankment. The time it takes that settlement to occur.
There is a concern that the embankment will fail during construction. Therefore, the embankment will be built in two stages to allow the alluvial clay to consolidate between the stages thus increasing the strength. At the end of the first stage, the embankment will be 1.5m high. It will be left for six months while the clay consolidates. Estimate the settlement of the first stage of the embankment at the end of six months.
3. A contractor proposes to use 2m square pad foundations for the columns of the portal frame shown in Figure B3. The formation level of the foundations is 1.5m below ground level. The 0.4m thick reinforced concrete floor slab, which is 15m wide and 30m long, carries an imposed load of 7.5kPa. The vertical load on the foundations due to the self-weight of the structure is 23.6kN per column; the imposed load, 36kN per column. Ignore any horizontal loads or moments acting on the pad foundations. Calculate the total settlement of the pad foundations.
4. A reinforced concrete caisson is to be sunk into a riverbed to form a permanent foundation for a bridge pier. The geological profile is given in Figure B4 and the soil properties in Table B4. Once the caisson is in place, a base slab is cast to create the foundation. Calculate the unit design bearing resistance using Design Approach 1 Combination 2.
Are You Looking for Answer of This Assignment or Essay
Have you been searching for Best Engineering Assignment Help in UK for a very long? Now, you have a one-stop solution and that is Assignment help UK with our experts your assignments will be done in a quick turnaround and you will get it within a timeline, We have a team of professional engineering writers who have huge knowledge in mechanical, software, computer languages, chemical, biotechnology, electrical and electronics, civil and all branches of engineering.