- Unit 4011 Fluid Mechanics (T/651/0724) Assignment Brief 2026
- Unit 4006 Mechatronics (Y/651/0716) Assignment Brief 2026
- Unit 4004 Managing a Professional Engineering Project (L/651/0712) Assignment Brief 2026
- 5CO02 Evidenced-Based Practice Learner Assessment Brief 2026
- Unit 605 Optimising Organisational Capacity Assignment Brief 2026
- Unit 603 Progressive Discourse in Modern Leadership Assignment Brief 2026
- Unit 8360-602 Developing Critical Thinking Assignment Brief 2026
- Unit 601 Developing Personal Effectiveness and Impact Assignment Brief 2026
- Unit 702 Developing and Maintaining a High-Performance Culture and Optimising Resources Assignment Brief 2026
- MDW4102 Physiological Principles of Midwifery Care Assessment 3, 2026
- BEM100L Sustainability in International Business Assessment Brief 2026
- Unit 16 Managing the Customer Experience (H/618/5057) Assignment Brief 2026
- Unit 13 Human Capital Management (J/618/1762) Assignment Brief 2026
- Unit 12 Executive Recruitment Solutions (F/618/1761) Assignment Brief 2026
- BTEC Level 4 Unit 9 Entrepreneurial Ventures (A/618/5047) Assignment Brief 2026
- Unit 15 Operational Planning and Management (K/650/2919) Assignment 1, 2026
- Sustainable Construction Technologies Assessment Brief 2026
- HCR5001 Public Health Assessment Brief 2026 | Arden University
- AP606 Advanced Aesthetic Procedures: Skin Boosters (T/651/7944) Assignment Brief 2026
- AP605 Advanced Aesthetic Procedures: Combining Radio Frequency and Micro-needling (R/651/7943) Assignment Brief 2026
ENX300 Manufacturing Systems Design Assignment 1 Brief 2026
| University | University of Sunderland (US) |
| Subject | ENX300 Manufacturing Systems Design |
ENX300 Assignment 1 Brief
| MODULE CODE: | ENX300 |
| MODULE TITLE: | Manufacturing Systems Design |
| TITLE OF ASSESSMENT: | Assignment 1 – Individual Assignment |
| LEARNING OUTCOMES: | LO1 – To be able to critically appraise the various sub-elements of the Lean/JIT methodology and their linkages |
| Submission Date and Time | 22 May 2026 ( by 11:00 pm HKT) |
| Submission Location | Via CANVAS https://canvas.sunderland.ac.uk/ |
Instructions
This assignment contributes 30% to your final module mark.
Please ensure that you retain a duplicate of your assignment. We are required to send samples of student work to the external examiners for moderation purposes. It will also safeguard in the unlikely event of your work going astray.
Question 1
The ‘TellyTv’ manufacturing company want to enter the flatscreen TV market and one of the first products they will manufacture is a general purpose 1080 Full HDTV. After ‘reverse engineering’ a sample of TVs from competitors, the planning department arrived at a set of timings and sequence for the assembly process. This is shown in Table Q1(a). It is envisaged that the plant will work a 1 x 8 hour shift 5 days a week over 48 weeks per year. Furthermore, the marketing department at ‘TellyTv’ have produced a sales forecast for the new TV’s which is given in Table Q1(b).
a) Assuming a Product layout (Long thin) arrangement, determine the following information for the 1st quarter of production:
i. The required cycle time and the theoretical minimum number of people required to assemble the products
(5 Marks)
ii. The ‘line design’.
(5 Marks)
iii. The actual number of people required to manufacture/assemble the product based on your design and what would be the balance loss and estimated output for this arrangement?
(6 Marks)
b) If a ‘short fat’ layout is used in the 1st quarter, how many people would be required to assemble the products? What is the balance loss and potential output for this arrangement?
(6 Marks)
c) Considering the two layouts ‘short fat’ or ‘long thin’, which layout is best suited to meet the demand in 4th quarter and why?
(12 Marks)
d) Discuss the advantages and disadvantages of both ‘long thin’ and ‘short fat’ layouts?
(16 Marks)
| STAGE 1 | Remove LED panel from bags and place face up | 12 secs |
| STAGE 2 | Remove plastic cover and turn over onto face | 19 secs |
| STAGE 3 | Mount PCB onto rear of TV with screws | 15 secs |
| STAGE 4 | Mount metal frame | 20 secs |
| STAGE 5 | Prepare and Fit LED panel inside front bezel | 23 secs |
| STAGE 6 | Fit power and main pc | 20 secs |
| STAGE 7 | Insert screws | 30 secs |
| STAGE 8 | Fit cables | 20 secs |
| STAGE 9 | Fit shielding plate | 22 secs |
| STAGE 10 | Fit rear cover and process to next stage | 23 secs |
Table Q1a Descriptions and timing of stages for assembly process
| Year 1 | Units |
| 1st quarter | 45000 |
| 2nd quarter | 50000 |
| 3rd quarter | 55000 |
| 4th quarter | 70000 |
Table Q1(b) Sales forecast Year 1
Question 2
a) Define JIT and Lean Manufacturing and contrast the similarities and differences between the two. Discuss why the ‘Traditional approach’ is more intuitive and what approaches are needed to move toward a JIT scenario?
(15 Marks)
b) Critically appraise five of the nine Just in Time (JIT) techniques e.g. reduction of set up time (SMED), TPM etc. highlighting what they are and how they would be implemented
(15 Marks)
c) Describe a tool or technique which can be used to analyse and improve the performance of manufacturing systems e.g. Rank-order clustering, Ishikawa diagrams, Value Stream Mapping Root cause analysis, Pareto Analysis etc. Explain the basic principle behind the technique, how it would be applied and any potential benefits/inhibitors to implementation.
(20 marks)
Marking Scheme for Question 2
| Q2 (a) | A clear definition of JIT and Lean Critical appraisal of similarities and differences including comments/ approaches to use | 5 marks
10 marks |
| Q2 (b) | Critical appraisal of 5 JIT techniques The theoretical and practical implementation of each element | 10 marks 5 marks |
| Q2 (c)
|
Description and principle of tool with appropriate diagrams
Application of tool Benefits and inhibitors to implementation |
10 marks
5 marks 5 marks |
| Total | 50 marks |
Where appropriate students should reference the source of the material using Harvard referencing. Suggested minimum word count for the whole of Question 2 : 1500 words
Professional Engineering Assignment Help for ENX300 Coursework Tasks
Having difficulty completing your ENX300 Manufacturing Systems Design Assignment 1? Many engineering students struggle with line balancing calculations, long thin and short fat layouts, JIT techniques, Lean Manufacturing concepts, and critical analysis because the assignment requires both numerical and theoretical understanding. That is why Students Assignment Help UK provides professional manufacturing engineering assignment help for Lean manufacturing reports, production system calculations, JIT analysis, and Harvard referencing support. You can also explore our university of sunderland assignment examples to understand proper structure and calculation methods before starting your work. Order today and get a plagiarism-free, custom-written solution prepared specially for your assignment requirements.


