- Health and Safety Law, Regulation and Influence (H/617/7542) Assignment Brief 2026
- Risk and Incident Management (Y/617/7540) Assignment Brief 2026
- Maintaining a Safe Workplace Environment (R/617/9092) Assignment Brief 2026
- OTHM level 6 Health and Safety Management Practice (Y/617/8526) Assignment Brief 2026
- Development of the Health and Safety Practitioner (K/617/7543) Assignment Brief 2026
- Promoting a Positive Health and Safety Culture (Y/617/8543) Assignment Brief 2026
- Health and Safety Management Principles and Policy (H/617/7539) Assignment Brief 2026
- Unit 4011 Fluid Mechanics (T/651/0724) Assignment Brief 2026
- Unit 4006 Mechatronics (Y/651/0716) Assignment Brief 2026
- Unit 4004 Managing a Professional Engineering Project (L/651/0712) Assignment Brief 2026
- 5CO02 Evidenced-Based Practice Learner Assessment Brief 2026
- Unit 605 Optimising Organisational Capacity Assignment Brief 2026
- Unit 603 Progressive Discourse in Modern Leadership Assignment Brief 2026
- Unit 8360-602 Developing Critical Thinking Assignment Brief 2026
- Unit 601 Developing Personal Effectiveness and Impact Assignment Brief 2026
- Unit 702 Developing and Maintaining a High-Performance Culture and Optimising Resources Assignment Brief 2026
- MDW4102 Physiological Principles of Midwifery Care Assessment 3, 2026
- BEM100L Sustainability in International Business Assessment Brief 2026
- Unit 16 Managing the Customer Experience (H/618/5057) Assignment Brief 2026
- Unit 13 Human Capital Management (J/618/1762) Assignment Brief 2026
Prepare a project time plan to develop the software program: Engineering unit 35 Assignment, UK
| Subject | Engineering Management |
Vocational Scenario or Context
You are employed as a trainee Software Developer and have been tasked with heading up a software development team to design, develop, and deliver a software solution for an internal problem.
The Stock Control Department has requested an upgraded software solution to their aging stock control system. They currently use a series of spreadsheets to control the incoming and outgoing stock in the company. They require a more appropriate solution, using a simple database and an easy-to-use User Interface. The database will be provided to you by the company’s database administrator (DBA).
Buy Answer of This Assessment & Raise Your Grades
Task 1
Design and develop the software program, providing documented user requirements. Carry out each individual stage for the Design, Development and Testing phases of the project.
For the design phase:
• Prepare a project time plan to develop the software program
• Prepare a terms of reference document to outline:
o Specification and user requirements of the desired program
o Structured pseudo code, flow charts and decision tables
o Justifications on choice of language
o Description of the deliverables, including the target user platform
• Prepare a system requirements specification for development and end use
• Produce user interface mock-ups of the new software program and design the program using structured design tools.
For the development phase:
•Use at least two programming paradigms, and a range of appropriate constructs to develop the designed software program, integrating into the provided data source, with appropriate comments and annotations to support future development.
• As you develop the software, create test scripts of the expected and unexpected conditions the software program will operate under. For the testing phase:
• Test the implemented software program following the planned test scripts and client requirements, and review any failed tests and repair the software program as required to optimise its efficiency and performance.
Are You Looking for Answer of This Assignment or Essay
Are you looking for BTEC Assignment help to get solution with your Engineering unit 35 Assignment task? studentsassignmenthelp.co.uk is the best platform for providing engineering assignment writing service for uk students.


