- Unit 5 Furniture and Accessories in Interior Design Assignment – National Design Academy
- 6ENT2030 Geotechnical Design Assignment Brief – University of Hertfordshire
- Network and Security Assignment Project Report for Global Enterprises
- Unit 5011 Industrial Power Electronics and Storage Pearson BTEC Level 5 Assignment Brief
- NU7020 Leadership and Quality Improvement and Governance Assignment – Trinity College Dublin (TCD)
- BTEC Level 3 Business Unit 4: Managing an Event – Assessment Brief
- NBS8641 Data Analytics for Business Insights Assessment Brief Semester 1 2025-26
- Biological Data Driven Coursework Questions 2025-26 – Pharmaceutical Sciences
- CETM71 Computer Architectures and Network Assessment 2 – University of Sunderland
- Level 5 Associate Diploma Unit 5CO01 Organisational performance and culture in practice Learner Assessment Brief
- Quantitative Methods for Accounting and Finance Assignment Reports
- MPM7002 Project Leadership Assessment Brief Semester 1 2025/2026
- E232 Exploring Childhood and Youth Tutor-Marked Assignment 01 | The Open University
- 5IT05 Network Routing and Switching – 603/4791/0 Qualifi Level 5 Diploma in Information Technology
- Unit 16 Computing Research Project Assignment- Mobile Security: Protecting Data on Smartphones and Tablets
- 6NH096 Enhancing Safety and Quality of Care in Adult Nursing Assignment Brief
- Leadership Critical Reflection: Exploring the Transition to Leadership within Epilepsy Specialist Nursing Practice
- T313 Renewable Energy Tutor-Marked Assignment – 01
- Pearson BTEC Level 4 Unit 4014 Production Engineering for Manufacture Assignment
- B99TG Introduction to Process Technology Assignment 1 – Mass Balances
You have recently joined a small electronic circuit manufacturing company as a quality manager: Pearsons BTEC HNC level 4 Assignment, UK
| Subject | Pearsons BTEC HNC level 4 Assignment |
Scenario:
You have recently joined a small electronic circuit manufacturing company as a quality manager, with the aim of introducing quality management systems to improve operational performance.
A recent survey by the production manager highlighted an increase in the number of faulty circuits postproduction, leaving output at an all-time low,n while overall unit cost of production has increased.
Are You Looking for Answer of This Assignment or Essay
Activity:
In a bid to convince the CEO that quality control processes should be put in place, you are tasked with completing a report on the topic on statistical process control in engineering and the cost effectiveness of quality control implemented by organisations.
Task 1
a) Your report will include discussions on the following topics:
• The techniques used to support quality control, explain how these techniques could be used in an industrial and business environment.
• Describe the processes used in statistical process control for an industrial environment, also consider whereabouts these processes could be applied.
Give justified reasons as to why you would recommend the use of statistical process control within an engineering environment.
b) To give your report some Engineering industry context you will include a discussion on:
• Quality control tools that are available, and where their use would be most effective. When discussing the quality control techniques that can be used to improve business performance, justify whether you think these methods would be effective.
• An analysis of the costing techniques that are used within an industrial environment, and the benefits of using them.
Task 2:
Further to your discussion in task 1, you will complete the below practical to highlight the effects of implementing a quality control tool.
A company manufactures electronic circuits in batches of 100. Each circuit is tested by QC for the current drawn when connected to a constant voltage. The acceptable limits for the current drawn is between 41 − 70 mA, any circuits that do not fall within the limits will have to be scrapped. The typical test results pre and post the introduction of QC are shown in table 1.1 below.

a) Produce a graphical presentation of the data shown in Table 1.1 to illustrate the effects of adopting a culture of quality control.
b) Using the standard costing method and the template shown in Table 1.2, produce a basic account sheet to calculate the net profit/loss for a month pre and post the introduction of QC. Assume that the values before QC are the standard, and you have also been given the following information:
Do You Need Assignment of This Question
• The company produces 50 batches of circuits each day.
• There are 20 production days in a month.
• Raw materials for each circuit costs £0.10.
• Each circuit is sold for £0.75.
• All units that pass quality control are sold.
• The monthly wage bill is £19,500 before the new manager is hired, and £21,000 afterwards.
• The company pays £3,000 a month in rent.
• Overheads were £300 in the month before QC, and £275 in the month after QC.
• Variances were £8.460 in the month before QC, and £10,320 the month after.

Buy Answer of This Assessment & Raise Your Grades
Excel in your Pearsons BTEC HNC Level 4 Assignment with ease! Our assignment help online service specializes in providing top-notch BTEC Assignment Help in UK. UK students can confidently pay our experts for tailored support. Let us guide you to success – reach out today and excel in your studies!



