- OTHM Level 5 Unit H/650/1142 Professional Supervision Assignment: Health & Social Care Case for Managing Supervision and Performance
- ATHE Level 4 Unit 15 Software Testing Frameworks Assignment: TDD and BDD Strategy for Medical Data Validation Script in Python
- ATHE Level 4 Unit 12 Web Design and Programming Assignment: CTO Birdwatching App Development for Urban Wildlife Insights
- ATHE Level 4 Unit 21 Synoptic Computing Project Assignment: Smart Parking App Design for Urban Mobility Solution
- ATHE Level 4 Unit 1 IT Systems Development Assignment: The World of Art Case Study for Global Online Sales Expansion
- CYP6032 Leading Multi-Agency Health & Social Care Assignment: Vulnerable Groups Literature Review and Reflective Evaluation
- Unit 21 – L/618/8101 Geotechnical Design Assignment 1: Scunthorpe Station Overpass & Bridge Infrastructure Proposal
- Y/616/7445 Unit 039 Diabetes Awareness Assignment: Understanding, Managing and Supporting Individuals with Diabetes
- DHCS 12 (M/650/5189) Understand Mental Ill Health Assignment: Explore DSM/ICD Disorders, Discrimination & Capacity
- Unit 8 Social Media Strategy Assignment 2: Planning, Execution & Evaluation for Organisational Growth
- CIPD Level 7CO01 Strategic People Management Assignment: Demographic Trends, Legal Reforms, Innovation & Resilience in the Workplace
- Financial Accounting Assignment: Lee’s Sole Trader Transactions & Cash Flow Analysis
- L/508/4603 NCFE Level 3 Sport and Exercise Massage Assignment 3: Consultation & Technique Review for Two Contrasting Athletes
- F/650/1141 Unit 4 Team Management and Recruitment Assignment: Health & Social Care Case Study for Effective Leadership and PDPA-Compliant Hiring
- R/650/1138 OTHM Level 5 Assignment: Working in Partnership in Health and Social Care
- NVQ Level 3 Health and Safety Risk Management Assignment: Practical Assessment and Workplace Application
- MBA7068 Strategic Portfolio Assignment 1: Global Business Trends and Managerial Skill Development
- Mechanical Services Innovation: Hotel Rotation Case Study for Energy-Efficient Heat Pump Integration
- K/618/4170 ATHE Level 3 Unit 4 Assignment: Working in Health and Social Care
- T/618/4169 ATHE Level 3 Unit 3 Assignment: Human Growth and Development in Health and Social Care
BTEC Level 5: Unit 45-Temperature controlling is required in nearly each and every field application such as household, industrial and other such applications: Industrial System(Electrical Engineering), Assignment, UK
Subject | Unit 45- Industrial System(Electrical Engineering) |
LO1 (Project 1)
Temperature controlling is required in nearly each and every field application such as household, industrial and other such applications. There is a requirement in your company to design a domestic hot water system. The company has selected a tank based hot water system to implement
1. Provide a diagram of tank based hot water system, including all of its main elements and describe all of those elements.
2. Provide a functional closed-loop block diagram identifying input, output,
transducers, controller, actuator, plant and etc. Further the customer is
requesting to mention input and output signals of all subsystems, in the
document you are providing. Using those information and other relevant
information, provide a review for the main concepts underlying the given
electronically controlled industrial system
3. In this project you have to maintain the temperature of a liquid at a prescribed temperature. The heat exchanger process is one of the methods that can use to maintain the temperature of a liquid at a prescribed temperature. In the given image, the temperature is measuring using a sensor and a transmitter, TT 22, which sends the measurements to a corresponding controller. TC 22 compares the actual temperature with a desired temperature at Set Point. (SP).
You have given the corresponding block diagram also for this system.
Transfer functions of above system, have been already derived by your supervisor and they have been shared with you.
You have been requested to analyse the characteristics of the electronically
controlled industrial system by applying suitable techniques. You may follow
the guidelines below.
- After this comparison at the set point, identify the way of controlling the
temperature in the tank. - Assuming Gs(s) =K, find the value of the K, by considering 0.7 damping ratio.
- Design a PD controller. You may take the settling time as 20%.
With the results you obtained analyze the characteristics of the given electronically controlled industrial system as this analysis have been requested by your client. You may use additional calculations for this analysis if required.
4. Your company is expecting a performance evaluation of this system before the implementation. Critically examine the performance of the given system. You may use required techniques and the calculations. Make the recommendations to improve the system. Describe how you are going to improve the system using your recommendations.
Are You Looking for Answer of This Assignment or Essay
Are you struggling with Unit 45 – Industrial System assignments in Electrical Engineering? Our expert team offers specialized assignment writing help in the UK. We provide comprehensive assistance for BTEC assignments and engineering assignment help online. UK students can rely on our services for high-quality, professional support. Don’t stress over your coursework; pay our experts and excel in your studies. Get started today and achieve your academic goals!
