- Unit 2 Marketing Processes and Planning (A/618/5033) Assignment Brief 2026
- TMDIBS204 Managing people in a Multinational Context Assignment Brief 2026
- BMS508 Entrepreneurship Assessment 2 Brief 2026 | New College Durham
- BMS508 Entrepreneurship Assessment 1 Brief 2026 | New College Durham
- BUS6010 Business Transformation Assessment Brief 2026 | Arden University
- Unit 805 Strategic Communication (L/506/9129) Assignment Brief 2026
- Unit 803 Strategic Planning for Cross Border and Global Organisations (L/506/9132) Assignment Brief 2026
- Unit 806 Culture and its Impact on Strategy (J/506/9128) Assignment Brief 2026
- Unit 800 Leadership Qualities and Practice (A/506/9126) Assignment Brief 2026
- EFAW301 Emergency First Aid in the Workplace (R/650/4839) Assignment Brief 2026
- SOCI5006 Popular Culture, Media and Society Assessment 1, 2026
- Resource Management in Health and Social Care (A/618/5503) Assignment Brief 2026
- Health and Safety in Health and Social Care Settings (T/618/5502) Assignment Brief 2026
- Principles of Leadership and Management (M/618/5501) Assignment Brief 2026
- Unit 601 Developing Personal Effectiveness and Impact Assignment Brief 2026
- OTHM Level 3 Diabetes Awareness (D/651/7162) Assignment Brief 2026
- OTHM Level 3 Health Promotion (A/651/7161) Assignment Brief 2026
- Personal and Professional Development in Health and Social Care (F/618/5499) Assignment Brief 2026
- Managing Quality in Health and Social Care Settings (K/618/5657) Assignment Brief 2026
- BAM4052 Finance for International Business Assignment Brief 2026
TC50324E: Measurement and Documentation Assignment 1, UOWL, UK
| University | University of West London School of Computing and Engineering |
| Subject | TC50324E: Measurement and Documentation |
Module learning outcomes
LO1
Develop an understanding of the Rules of Professional Conduct and International Property Measurement Standards (IPMS) and Bills of Quantities.
LO2
Measure low rise (office and residential buildings) in line with the RICS New Rules of Measurement 2 Guidance in sub-structures, site preparation, as well as different elements of the building such as brick and blockwork, flat roofs, floors, partitions, walls, staircases, internal finishing, doors/windows, and drainage.
LO3
Develop an appreciation of the philosophy of coordinated project information
LO4
Develop the ability to use the RICS Code of measuring practice to allow for accurate measurement of buildings and land and buildings on a common and consistent basis.
LO5
Ensure accuracy and practice RICS Data Standards in all methods of measuring including digital measuring.
Do You Need Assignment of This Question
2. Traditional Measurement and Bill of Quantities Preparation
Assessment Overview
Today, most bills of quantities are produced using proprietary software packages, each system having its own format for inputting dimensions and formulating descriptions. However, knowledge of measurement conventions is useful to fully understand and appreciated potential problems in the measurement process. The ability to take off manually is an essential skill for any Quantity Surveyor.
Scenario
The construction industry is and will continue to be, a key driver of economic recovery as we move back towards normality, and it is critical that the industry plays its part in this recovery and create a more diverse sector. Land availability has become increasingly problematic for smaller firms. Everyone needs access to secure, decent housing. In the UK, housing supply has not been keeping up with demand. Getting access to housing of any type is becoming increasingly difficult for low-income households.
You are a trainee Quantity Surveyor employed by a renowned international engineering, design, and project/cost management consultancy company. Your employer has asked you to provide professional building quantifications and cost consultancy services for drawings attached to this coursework brief on Blackboard.
Buy Answer of This Assessment & Raise Your Grades
Task 1 Traditional Measurement
Using the attached drawings on the Blackboard, manually take off for the following items below using NRM2:
Substructure
Site preparation, excavation work for foundation work, backfilling of excavated materials, concrete in foundation, substructure brick/block work, wall cavity, damp proof membrane, DPC, hardcore, and ground floor slab.
Superstructure
Walls including cavity, windows, doors, skirting, floor, ceiling finishing, roofing board, roof trusses, and roofing tiles.
Task 2 Contract Documents Preparation
In addition to task 1 above, in preparation for contract documentation and to demonstrate your understanding of coordinated project information, your manager wants you to carry out the following written assignment:
- a. What is the purpose of a Bill of Quantities (BoQ)?
- Following NRM2, how would you structure a BoQ?
- What is the purpose of the Code of Measuring Practice?
- Briefly explain the following terms in a standard Bill of Quantities:
- Preliminaries
- Provisional sum
- Prime cost sums
- Contingency sum
- a. How would you describe the preliminaries section on a Bill of Quantities?
- What information is required to measure preliminaries?
Are You Looking for Answer of This Assignment or Essay
The TC50324E: Measurement and Documentation Assignment 1 can be challenging, but Studentsassignmenthelp.co.uk is here to assist! Our expert team specializes in providing top-notch support for your assignments, ensuring quality, accuracy, and timely delivery. With our Assignment Writing Service UK, you’ll receive customized solutions tailored to your academic requirements. Say goodbye to stress and hello to top grades with our reliable assistance. Trust us to make your academic journey smoother and more successful. Contact Studentsassignmenthelp.co.uk today and let us help you excel in your coursework with ease and confidence!



