- D/618/7406 Unit 5: Challenges of IT Security in Modern Organizations – Risks, Solutions & Best Practices
- HSC Level 2/3 Unit 012 Assignment: Care Worker Responsibilities and Ways of Working
- CIPD Level 5HR03 Assignment: Understanding Reward Approaches and Their Impact on Performance and Contribution
- CIPD level 5HR02 Assignment: Talent Management and Workforce Planning Unit Guide
- Level 3 D/615/3823 Assignment: Regulation, Protection, and Collaborative Practice in Health and Social Care
- PGM216D Assignment: Bicycle Store Sales Management Application
- MATH6033 Assignment: Epidemiological Investigation of Cardiovascular Health and Tea Consumption Risks
- EH6147 Assingment: Stakeholder Analysis for Quality Improvement in Hand Hygiene Compliance
- Assignment: Investigation of Solution Concentration Through Standard Preparation, Titration, and Colorimetry Techniques
- MATH6033 Assignment: Cardiovascular Risk and Tea Drinking: Epidemiological Analyses
- CIPD level 3 3CO03 Assignment: Core behaviours for people professionals
- DAC4B1: Personal development in adult care settings
- Unit 19 Research Project Assignment 1: Impact of Corporate Social Responsibility on Business Success & Community Wellness
- EG5022 Assignment: Georeferencing and Accuracy Assessment of a Quarry 3D Model Using Photogrammetric GCPs
- Assignment: Financial Performance and Strategic Analysis of a UK Listed Company: A CORE Evaluation and Reflective Review
- 5CNMN002W Assignment: Advanced measurement- Major measurement taking off
- K/650/2298 Level 3 Understanding Roles, Responsibilities, and Effective Partnerships in Health and Social Care
- Understanding Information and Knowledge Management in the Workplace: A Briefing for HR Professionals
- HRM7010D Strategic Use of People Analytics in Enhancing Organisational Value and Agility
- TOWN1060 Urban Planning in the UK History Sustainable Design and Future City Development
Civil CEP: Numerical Analysis Assignment 1, UOB, UK
University | University of Bristol (UOB) |
Subject | Civil Engineering Projects Execution Plan |
- List the pile which classified according to the material used for construction, then
discuss indetail the advantage and disadvantage of these type of pile.
- What will happen if you install driven pile in clay and sandy soil?
- Describe collapsible soil and its nature under load
- Explain the difference between shallow foundation and deep foundation?
- Define Negative skin Friction. How it developed?
- A concrete pile is 16m long and 400mm X 400mm cross section The pile is fully
embedded in sand forwhich unit weight of soil γ= 18kN/m3
and ϕ=30o Calculate
ultimate point load, Qp by
- Meyerhof’s method
- Vesic method if Es=20.5MN/m2 μs=0.3 for sand
III. Janbu method if η’ =900
, for this sand
Do You Need Assignment of This Question
- A concrete pile is 16m long and 400mm X 400mm cross section The pile is fully
embedded in sand forwhich unit weight of soil γ= 18kN/m3
and ϕ=30o
- a) Determine the frictional resistance Qs using K=1.3 and δ =0.8ϕ
- b) Using the result Qp obtain from Ex 1, estimate the allowable load carrying capacity
of the pile.Take Fs=4
- A pile (closed end) that has been driven in to a layered sand is shown in figure 1
calculate:
- The ultimate point load by Meyerhof’s procedure
- The ultimate frictional resistance, Qs, use K = 1.4, and δ’= 0.7ϕ
- The allowable load of the pile, use FS = 4
- A concrete pile is driven into the strata shown in Fig 2. Based on data given in
Fig 2,determine ultimate point load, Qp by
- Meyerhof’s method
- Vesic’s method if Es =20MN/m2
- Janbu method if η =75
- Determine frictional resistance using the same data as shown in Fig 2 assuming that
the pile is high displacement driven pile and δ =0.7ϕ
- Determine allowable capacity of pile if FS =3.5
- A driven pile in clay shown in the following Fig, the pile has an outside diameter
of 400mm and wallthickness of 6.35mm.
- a) Calculate the net point bearing capacity of the pile
- b) Calculate skin friction by methods for clay layer. The top 10m of the clay is
normallyconsolidated. The bottom clay layer has an OCR =2
- c) Estimate the net allowable pile capacity if FS=4
Are You Looking for Answer of This Assignment or Essay
Answer