- Care Safeguiding Children Assignment | Oxford Brookes University
- PSY4011 Developmental Psychology Assessment Brief | Arden University
- QSP7PCM Professional Cost Management Assignment 2 September 2025 | UCEM
- EGR2006M Control Systems Assignment 1 Brief | University of Lincoln
- MBA7066 Innovation and Entreprenuership Assignment Portfolio 2025 | UGM
- Contract Law Assessment 2 Problem Scenario 2025-26 | University Of Salford
- Operations & Supply Chain Management Assignment Brief : E-Commerce Supply Chain Efficiency
- Unit 1 Programming Assignment 2025-26 | ESOFT Metro Campus
- K/651/4745 Unit 1 Teaching My Subject Written Assignment | Britannia Education Group
- H/650/1099 Level 4 Academic Writing and Research Skills Assignment Brief | LSBU
- ASB-4012 Codding for Business Application Assignment – Project in R | Bangor University
- Unit: Team Management in Health and Social Care OTHM Level 5 Diploma Assignment
- BTEC Level 3 Unit 4 Programming Assignment – Concepts of Programming
- HSO4004 Principles of Care Assignment-1 and Assignment-2 Semester-1 September 2025-26
- 1031ENG-N Civil Engineering Construction Technology In-Course Assessment (ICA) Group Report | Teesside University (TU)
- MOD009382 Finance and Governance in Health and Social Care 011 Assessment Coursework Report | Anglia Ruskin University
- Geotechnical Engineering Assignment 2025/26 – University Of Surrey (UniS)
- Essentials of Adult Nursing Summative Assessment – University of Roehampton London (UoRL)
- BMP3006 Practical Digital Marketing Assessment 1 Individual Written Portfolio September 2025 – Regent College London
- CIPD_5HR03_24_01 5HR03 Reward for Performance and Contribution Level 5 Associate Diploma Learner Assessment Brief – Chartered Institute of Personnel and Development
BA3005: A Carpet Shop Specialises in Selling six types of Fine Carpets Named Simply as Iranian Algerian Turkish Peruvian Uzbek and Malian: Managing Data and Information Assignment LMU, UK
| University | London Metropolitan University (LMU) |
| Subject | Managing Data and Information |
Task A
A carpet shop specialises in selling six types of fine carpets named simply as “Iranian”, “Algerian”, “Turkish”, “Peruvian”, “Uzbek” and “Malian”.
The shop wants you to create an Excel sales table consisting of the following entries:
| Type of carpet | N° of units sold | Price (£) | Total (£) |
They want to data-validate as a list of the cell presented in green above.
The number of carpets (N° of units) to be sold should be data-validated as a number that does not exceed TWO. The price (£) should be retrieved from the following table using an XLOOKUP formula.
| Type of carpet | Price (£) |
| Iranian | 12000 |
| Algerian | 10000 |
| Turkish | 8000 |
| Peruvian | 15000 |
| Uzbek | 20000 |
| Malian | 14000 |
The Total (£) column should be calculated using the following Excel formula:
Required:
Produce an Excel worksheet showing how you will progress the above project. You need to show useful screenshots and formulae for all the activities and give how your table retrieves the price for the “Peruvian” carpet. You should insert all your work on a single WORD page.
Do You Need Assignment of This Question
Task B
An airline company surveyed its passengers regarding their experience through the airport. In particular, they wanted to examine the level of their satisfaction and the time taken to get through the airport.
The satisfaction level is measured using scores from 0=Not at all satisfied to 60=Very satisfied.
The time through the airport was measured by giving each passenger a card once they arrive at the airport to be returned to an agent once they reach the departure lounge and the time measured in minutes.
The following questionnaire was used. The data is recorded in the filename “Airport.xlsx”.
The questionnaire
| About you and your travel | ||||||
| Q.1: Is your [Age]: 1. <20 | 2. 20 to 29 | 3. 30 to 39 | 4. 40 to 49 | 5. | 50 and over | |
| Q.2: Are you travelling today [Type]? | 1. | Business | 2. Holiday | 3. Family visit | ||
| Q.3: Are you travelling [Class]? | 1. | Business (First) class | 2. | Economy | ||
Q.4: How many pieces of [luggage] are you travelling with? Please state:
Required
- Produce frequency and percentage frequency tables for each of the following variables:
- Age
- Type (of travel)
- Draw a bar chart representing the variable “Age”.
- Calculate the descriptive statistics (Location and spread) for the variable “Satisfaction”.
The descriptive should include the minimum, maximum, both quartiles, mean, median, variance, standard deviation, range and inter-quartile range.
Please note that the statistics should be presented correct to a whole number but the mean and standard deviation should be presented correctly to the nearest 1 decimal place.
- Draw a box plot for the variable “Satisfaction” split by “Class” of travel.
- Draw a scatter diagram of the “satisfaction” score against “time” taken, calculate the correlation coefficient and show the linear regression equation in context (not in x and y).
Buy Answer of This Assessment & Raise Your Grades
Task C
A builder contacted you for project management work in order to plan a medium scale building project. He knew all the different activities of the job, their precedence and their average durations which he shared with you. They are shown in the table below.
| Activity | Duration (Weeks) | Preceding activities | |||||||
| A | 1 | None | |||||||
| B | 2 | None | |||||||
| C | 3 | A and B | |||||||
| D | 4 | C | |||||||
| E | 2 | A | |||||||
| F | 4 | E | |||||||
| G | 3 | D | |||||||
| H | 2 | F | |||||||
| I | 2 | H |
Required:
- Draw a network diagram and conduct the forward and backward pass.
- State the duration of this project and the critical path.
- Explain, without doing any calculation, what would happen to the project if the actual duration of activity A is two weeks. No more than 20 words.
Note:
The work for this task should be produced using Word drawing facilities. The forward and backward passes should be clearly shown on the diagram. Each activity should be described using the notation shown in class as follows:
| Activity name | Earliest start time | Earliest finish time |
| Activity duration | Latest start time | Latest finish time |
Task D
A small hotel with 8 rooms is located in central London. Based on records over the last 5 years, it was estimated that the probability a room is occupied on any particular “weekend” night (Saturday and Sunday) is 0.7. This is the probability of success.
On any particular “weekend” night, a hotel is only occupied (Success) or not occupied (Failure).
There are no other possibilities.
- What is the probability that FOUR or more rooms are occupied on any particular weekend night? Show all your calculations using a well laid-out Excel spreadsheet table.
The occupancy rate on any particular night during a weekday (Monday to Friday) is assumed to be 50%, i.e. a room has a probability of 0.5 to be occupied during any week-day.
On the first Monday on January, 2 out of the 8 rooms were occupied.
- What is the p-value? You need to show the table of values for your calculations
Give your answers correct to 3 decimal places.
Are You Looking for Answer of This Assignment or Essay
Are you still searching for an assignment on Managing Data and Information? Search no more, students assignment help as the name speaks our experts are skilled in such types of assignments will do your all kind of assignments in a brief amount of time and also in a pocket-friendly rate.



