- Wind tunnel testing plays an important role in the design of aircraft. It provides a check on the accuracy of the initial design: Aerospace Engineering, Coursework, UOL, UK
- Select and apply appropriate computational and analytical techniques to model complex problems, recognising the limitations of the techniques employed :AHEP- Assignment 1 , UK
- Cipd level 5 5HR01 Assignment 3 June 2024 : Employment relationship management, UK
- Pearson BTEC Level 3 Unit 6: Website Development : Website evaluation, Assignment, UK
- BTEC Unit 20: Explain, analyze, optimize, and enhance the operation of a simple combinational logic circuit with three (03) fail-safe sensors and one (01) emergency shutdown switch- Digital Principles Assignment 1, UK
- Complete a report to compare three academic sources to identify levels of relevance and application: Health wellbeing and social care, Assignment, UK
- Fluid Power Diagrams – Applications Of Pneumatics And Hydraulics, Tutor Marked Assignment 2, TU, UK
- Fluid Power Diagrams – Applications Of Pneumatics And Hydraulics, Tutor Marked Assignment 1, TU, UK
- Pearson BTEC Level 3 Unit 8 Mechanical Principles of Engineering Systems : Statics, Assignment, UK
- CBB508 – Understand the structure of the eukaryotic cell and the functions of the different components: Cells Assignment, OCN, UK
- Unit4003: Engineering Science I : Examine scientific data using both quantitative and qualitative methods, Assignment, HNC, UK
- COM4007 – Identify design, usability and accessibility issues involved in delivering websites: Introduction to Web Authoring Assignment, AU, UK
- Access to HE Diploma Assessment Materials Sourcing and Reading Information (2024-25) : Computing, Assignment, OCN, UK
- Level 5 This unit will develop your knowledge of the importance of leadership and management theories and styles: The Principles of Leadership and Management in Adult Social Care, Assignment, UK
- Unit 4 – Identify indicators of your wellbeing and wellbeing deterioration: Promoting Personal Wellbeing, Assignment, UK
- Level 6 NUR6065 : An exploration of the care and management of a patient with complex health needs- Nursing care: adult, Assignment, BCU, UK
- COM4008: Demonstrate a knowledge and understanding of databases and data management systems- Introduction to Databases, Assignment , AU, UK
- 3CO04 Level 3 CIPD Assignment : June 2024 – Essentials of people practice
- 3CO02 Level 3 CIPD Assignment : June 2024 – Principles of analytics
- 5013FTE Internal Combustion Engine Simulation Report: Vehicle Systems and Development, Assignment, CU, UK
EG5016: Surveying Field Scheme (RESIT), Assignment, UOEL, UK
University | University of East London ( UOEL) |
Subject | EG5016: Surveying Field Scheme (RESIT) |
Learning Outcomes
- Clarify the role of the surveyor in construction projects.
- Identify the principal requirements of surveys for construction projects.
- Use surveying equipment and calculation methods to minimise error propagation.
- Evaluate problems and apply appropriate measurement and computation systems.
- Analyse the precision of measurements and resulting values.
- Use instruments and measurement techniques according to surveying principles.
- Record measurements and present results.
- Carry out simple setting out of coordinated points.
- Undertake collection and basic processing of 3D data.
- Use measurement and presentation techniques, including graphical forms.
- Demonstrate evidence of reflection on academic performance by implementing feedback given
Buy Answer of This Assessment & Raise Your Grades
TASK A : CONTROL TRAVERSE
Task :
- To establish control points around the site to be used for setting out the design.
- The coordinates of two stations can be found by resection from the yellow targets (details on Moodle)
- Each person of the group is required to observe at a minimum of one point.
- Each person of the group is required to book and reduce the observations at a minimum of one point. (thus a 3 station traverse)
- Two rounds of horizontal to be observed at each point (changing the zero each time) with a maximum spread of 20” (if not achieved extra rounds will be required until they are).
- A “Station Description” of each point is required
- Calculate the coordinates of each point.
The control is to be observed as a closed loop traverse. Each person is to calculate the traverse INDEPENDENTLY to obtain the point coordinates from the raw observations: Determine the angular and linear misclosures, apply corrections as appropriate using the Bowditch method of adjustment. The coordinates will be required for the setting out task. Check with each other, otherwise the whole group could fail by the actions of one.
Procedure
Identify the control points. The three tripod traversing technique will be used. The instrument is to be set up at each point in turn working around the traverse in an anticlockwise direction – each student is to observe and book (including reduction to measured value) the observations for at least one station. Each student is responsible for the observations at all the points. Horizontal angles are to be observed as rounds of face left and face right observations. At least two rounds should be observed with a maximum spread of 20” using different zeros. All observations must be reduced / calculated at the point before removing the instrument.
On completion, you will need to confirm that your total internal angles add up to the required amount. Calculation of the actual co-ordinates is required to be carried out as the results form the basis of the setting out task.
Levels of each station are required to be determined by vertical angles and checked using an automatic level. Bench Mark (BM) value to be taken as 5.510m OD.
TASK B: SETTING OUT (by Co-ordinates)
Task:
- To set out points (indicated by flags) to indicate the position of a proposed sculpture.
- The points are provided as co-ordinates and will need to be related to the control traverse points
Procedure:
The points need to be loaded into the total stations (don’t forget to start a new job). The first stage is to input your control point information into the database.
Set up over one of the control points (most convenient for the task) and orientate to one of the others, checking to a third to confirm direction (or you could end up setting out over the dock edge).
Find the first point in the database and the total station will show you how much to turn and how far you need to go to set the point out. Repeat for each of the points.
The points are to be independently checked and an estimate of their accuracy determined. Checks will be by taping between points and diagonals to ensure dimensional correctness. You will need to compile a table indicating what the points should be, what you actually achieved and, most importantly, the DIFFERENCE between them.
Do You Need Assignment of This Question
TASK C :
Volumes Reduced levels taken from total station 20m x 20m grid
Draw a section from X-Y Contour the grid with a 1 metre interval.
Determine the volume of cut material to be removed to obtain a flat formation level (FFL) of 20m within the highlighted part of the grid.
To find the volume of each individual ‘cube’, find the average of the four corners (for each cube), remove the 20m FFL and multiply by the area of the square.
Are You Looking for Answer of This Assignment or Essay
Need help with your EG5016: Surveying Field Scheme (RESIT) assignment? Our assignment help UK service is here to support you. We offer top-notch coursework writing services tailored to your needs. UK students can pay our expert to get professional assistance and excel in their courses. Don’t let challenging assignments hold you back—contact us today and ensure your academic success with our expert guidance!