- Person-centred Approaches in Health and Social Care Settings Assignment: Guidance Document and Consent Briefing Report | LCPS
- BEM1083DA Business Environment and Organisational Strategy Assessment 2 2026/27: Effective Project Manager Presentation | University of Exeter
- Principles of Business and Resource Management for Leaders of Adult Social Care Assignment Brief 2026 (Level 5 Diploma)
- 7132PY Project Planning and Ethics Capstone Research Ethics Proposal Assignment Brief 2026 | Coventry University
- Property Law Problem Question: Easements, Licences and the Sale of Hardacre (Advise Enya)
- NUR6074 Leadership and Decision Making in Adult Nursing Assessment Brief 2026: Practice Change Presentation | Birmingham City University
- PSY4007 Introduction to Studying Psychology Portfolio Assessment Brief: Five Tasks from Perspectives to Academic Skills | Arden University
- HSO5004 Health Promotion: Challenges and Opportunities Assessment Brief 2026: Health Promotion Event and Evaluation Report | Regent College London
- CIPD Level 3 3CO01 Business, Culture and Change in Context Assessment Questions: Gearspan Ltd Case
- DL503 Land Law Assignment Brief 2026: Qualifi Level 5 Diploma in Law (Proprietary Estoppel and Case Study)
- CIPD 5LD01 Support Informal and Self-Directed Learning Assessment Brief 2026: Lux-stay Case Study
- SPY00157M Exploring Policy Research Summative Assessment Brief 2026 | University of York
- COM4024 Introduction to Academic Skills and Professional Development Assessment Brief 2026 | Arden University
- VTCT Level 4 UBT501 and UBT503 SAR Assignment Paper B Brief 2026
- CET3016 Enterprise Software Engineering Assignment 1 2026: SunMortgages Analysis and Design | Sunderland
- Unit 8204 Working in Partnership with Others and Unit 8201 Person-Centred Assessment Questions: Level 4 Diploma in Adult Care
- AP503 Working Collaboratively with Healthcare Professionals Assignment Brief 2026
- AP502 Professional Standards within Aesthetic Practice Assignment Brief 2026
- AP501 Legal and Regulatory Requirements in Aesthetic Practice Assignment Brief 2026
- 7FNCE015W Global Banking and Lending Assessment 1, 2026 | UOW
EG5016: Surveying Field Scheme (RESIT), Assignment, UOEL, UK
| University | University of East London (UEL) |
| Subject | EG5016: Surveying Field Scheme (RESIT) |
Learning Outcomes
- Clarify the role of the surveyor in construction projects.
- Identify the principal requirements of surveys for construction projects.
- Use surveying equipment and calculation methods to minimise error propagation.
- Evaluate problems and apply appropriate measurement and computation systems.
- Analyse the precision of measurements and resulting values.
- Use instruments and measurement techniques according to surveying principles.
- Record measurements and present results.
- Carry out simple setting out of coordinated points.
- Undertake collection and basic processing of 3D data.
- Use measurement and presentation techniques, including graphical forms.
- Demonstrate evidence of reflection on academic performance by implementing feedback given
Buy Answer of This Assessment & Raise Your Grades
TASK A : CONTROL TRAVERSE
Task :
- To establish control points around the site to be used for setting out the design.
- The coordinates of two stations can be found by resection from the yellow targets (details on Moodle)
- Each person of the group is required to observe at a minimum of one point.
- Each person of the group is required to book and reduce the observations at a minimum of one point. (thus a 3 station traverse)
- Two rounds of horizontal to be observed at each point (changing the zero each time) with a maximum spread of 20” (if not achieved extra rounds will be required until they are).
- A “Station Description” of each point is required
- Calculate the coordinates of each point.
The control is to be observed as a closed loop traverse. Each person is to calculate the traverse INDEPENDENTLY to obtain the point coordinates from the raw observations: Determine the angular and linear misclosures, apply corrections as appropriate using the Bowditch method of adjustment. The coordinates will be required for the setting out task. Check with each other, otherwise the whole group could fail by the actions of one.
Procedure
Identify the control points. The three tripod traversing technique will be used. The instrument is to be set up at each point in turn working around the traverse in an anticlockwise direction – each student is to observe and book (including reduction to measured value) the observations for at least one station. Each student is responsible for the observations at all the points. Horizontal angles are to be observed as rounds of face left and face right observations. At least two rounds should be observed with a maximum spread of 20” using different zeros. All observations must be reduced / calculated at the point before removing the instrument.
On completion, you will need to confirm that your total internal angles add up to the required amount. Calculation of the actual co-ordinates is required to be carried out as the results form the basis of the setting out task.
Levels of each station are required to be determined by vertical angles and checked using an automatic level. Bench Mark (BM) value to be taken as 5.510m OD.
TASK B: SETTING OUT (by Co-ordinates)
Task:
- To set out points (indicated by flags) to indicate the position of a proposed sculpture.
- The points are provided as co-ordinates and will need to be related to the control traverse points
Procedure:
The points need to be loaded into the total stations (don’t forget to start a new job). The first stage is to input your control point information into the database.
Set up over one of the control points (most convenient for the task) and orientate to one of the others, checking to a third to confirm direction (or you could end up setting out over the dock edge).
Find the first point in the database and the total station will show you how much to turn and how far you need to go to set the point out. Repeat for each of the points.
The points are to be independently checked and an estimate of their accuracy determined. Checks will be by taping between points and diagonals to ensure dimensional correctness. You will need to compile a table indicating what the points should be, what you actually achieved and, most importantly, the DIFFERENCE between them.
Do You Need Assignment of This Question
TASK C :
Volumes Reduced levels taken from total station 20m x 20m grid
Draw a section from X-Y Contour the grid with a 1 metre interval.
Determine the volume of cut material to be removed to obtain a flat formation level (FFL) of 20m within the highlighted part of the grid.
To find the volume of each individual ‘cube’, find the average of the four corners (for each cube), remove the 20m FFL and multiply by the area of the square.
Are You Looking for Answer of This Assignment or Essay
Need help with your EG5016: Surveying Field Scheme (RESIT) assignment? Our assignment help UK service is here to support you. We offer top-notch coursework writing services tailored to your needs. UK students can pay our expert to get professional assistance and excel in their courses. Don’t let challenging assignments hold you back—contact us today and ensure your academic success with our expert guidance!




