- BTEC Level 5 Unit 28 Risk Analysis & Systems Testing Assignment Brief
- IS1S451 Information Systems Analysis and Design 1 Assignment | USW
- Economics Undergraduate Assessment Criteria | University of Manchester
- BTEC Level 5 Unit 17 Business Process Support Assignment Brief 2026
- QSP7PCM Professional Cost Management Assignment 2, September 2025 | UCEM
- LD7008 Wireless Networks and Security Assessment 2 Brief 2026 | NU
- LD7008 Wireless Networks and Security Assessment 1 Brief 2026
- HSO4008 Introduction to Evidence-Based Research Assignment Brief 2026
- MAN-40355 Achieving Excellence through Managing Operations Assessment Report 2026
- COM6016 Distributed and Cloud Computing Assessment Brief 2026
- BTEC Level 5 Unit 4 Database Design & Development Assignment Brief 2026
- BTEC Level 3 Unit 13 Introduction to Criminology Assignment Brief
- BTEC International Level 3 Unit 8 Human Resources Assignment Brief 2026
- BTEC Level 4 Unit 9 Entrepreneurial Ventures Assignment Brief 2026
- COM6013 Cybersecurity and AI Dissertation Project Assessment Brief 2026
- ACC4043-N Contemporary Management In Operations And Finance ECA 2026
- BMGT2300 Digital Content Systems and Ecommerce Assignment 1 Brief 2026
- BMGT3000 Digital and Social Media Marketing Assignment 1 Brief 2026
- MN5619 Research Project Assessment Brief 2026 | Brunel University
- U14521 Relationships and Sex Education Assessment 2 Brief 2026
Your employment as a graduate quantity surveyor in an international quantity surveying practice has commenced: Analytical Chemistry and Measurement Science Assignment, TUM, UK
| University | The University of Manchester (TUM) |
| Subject | Analytical Chemistry and Measurement Science |
Assignment Brief and Guidance
Your employment as a graduate quantity surveyor in an international quantity surveying practice has commenced. You have been tasked with a take-off for a two-story Observation Tower. The building will be constructed by a simple R.C. structure, with a 100 mm thick concrete block wall enclosed as
a reception area located on the ground floor. The whole construction project will be in the use of a rule of measurement adopted in H.K. within which the work will be undertaken.
You will be tasked with providing the following considerations for the initial stages of the Observation Tower project.
- An explanation of the technique that you will use to produce quantities.
- Why accuracy is important when using this technique.
- Assemble bills of quantities for a section of work from the measurements.
Assignment 1
1) The production of accurate quantities is essential in avoiding disputes and claims during the construction stage of a project. Produce a short synopsis that outlines the techniques that can be used, both digitally and manually, for the production of accurate quantities for the project. The critique should evaluate in critical terms the relationship between the technique and accuracy.
2) Normally construction projects’ quantities are produced in an agreed format. This format is termed a ‘Rule of Measurement’ and in H. K. this is produced by The Hong Kong Institute of Surveyors. Local rules of measurement being existed that must be honored in the territory where
the project is going to be built. Produce an explanation of how the use of a rule of measurement supports the production of accurate quantities.
3) With reference to the attached Drawings No. M&D-2014-01 and M&D-2014-02, take off the quantities for both substructural and superstructural works of the building. Plastering and paving, painting are applied to the internal of the reception. Produce the following quantities using dimension papers.
Buy Answer of This Assessment & Raise Your Grades
Don’t wait for the last-minute submission of your Analytical Chemistry and Measurement Science Assignment and get the affordable solution from Assignment help UK. our brilliant experts provide the CIPD assignment help, HND assignment help, HNC assignment help, and Nursing assignment help as per your university norms within the timeline.