- MARK5025 Contemporary Marketing Communications Assessment Coursework Brief 2
- GEEN1127 Design and Materials Individual Coursework Brief 2025-2026 | UOG
- BPS319 PBL 3 Natural Product Chemistry vs Kinetic Isotope Effects Coursework | UOL
- LD7098 Cyber Security Principles Coursework Assessment 2025-26 | Northumbria University
- EG7004 Soil Structure Engineering Assignment 1 Coursework Semester A 2025/26 | University of East London (UOEL)
- BSC127 Information and Knowledge Management Individual Coursework | Loughborough University
- CI5250 Computing Systems Assignment – Networking Design Coursework | Kingston University
- Critical Literature Review Assignment 001 Coursework | Harvard University
- AFE_5_TAP Taxation Practice Assignment Coursework | London South Bank University
- EEEE3083 Power Electronic Aplications and Control Assessment Coursework 1 Individual Report | University of Nottingham
- 7BUIS008W Data Mining & Machine Learning Individual Coursework
- DFI4002 Introduction to Finance Assessment Essay Coursework – Arden University
- CPD Planned Learning Form – Overseas Pharmacists Assessment Programme (OSPAP) Coursework
- CMP-L0170 Level 7 Computer and Operating Systems Assessment Coursework portfolio
- IF1201 Assignment: Developing Financial and Utility Tools Using VBA in Excel
- MA12009 Exploratory Data and Statistical Analysis of Airbnb and Spotify Datasets
- NVQ Level 5 Unit 507 Safeguarding in Adult Care
- Structural Design of a 4m Roof Beam: Load and Stability Analysis, Assessment 2
- M33118 Configuring and Studying ASA Basic Settings and Firewall Using CLI
- The Reasons For Hitler Gaining Power In 1933, Course Work
MN4063: A project consists of 9 activities, each with a specific duration stated in weeks. For example, Activity E takes 3 weeks to complete: Understanding Data Course Work, LMU, UK
| University | London Metropolitan University (LMU) |
| Subject | MN4063: Understanding Data |
Task 1: Networking
A project consists of 9 activities, each with a specific duration stated in weeks. For example, Activity E takes 3 weeks to complete and can only be started after Activity C has been completed. Information on the 9 activities is outlined in the precedence table (Table 1) below.

Construct the network diagram using the standard node layout (see below) introduced in the lecture.
![]()
Task 2: Sample Data
To gain insights into the typical price consumers are willing to pay for a bag, a bag designer randomly selected 42 designs from its summer collection.

Task 3: Probability
In a recent survey, 70% of respondents were male and 30% of all male respondents did not own a car. In total, 25% of respondents did not own a car.
Task 4: Relationships
To operate more effectively, a retailer wants to better understand the relationship between sales revenue, total costs, average order value, and gross profit. To this end, data for the past 12 months were made available.
Do You Need Assignment of This Question
Are you looking for the finest assignment assistance? If so, you are on the right platform! At Students Assignment Help UK, our team of experienced professionals can help you with anything from writing original research papers to completing complex projects. You can pay for college assignments, homework, or any other task you need help with and we will do our best to get you the best results.



